Armstrong at Work
Find out how Armstrong consistently saves time, money and energy for some of the largest, most efficient companies in the world.
Review some of our case histories to see how we've solved problems and prevented them for satisfied customers throughout your industry. Then contact us to find out what we can do for you.
Download Armstrong Global Services Brochure- Efficiency and Energy Savings Case Studies
- Safety and Risk Reduction Case Studies
- Engineering, Audits and Turnkey Project Services Case Studies
- O&M Case Studies
- Skill Development and Training Case Studies
Efficiency and Energy Savings Case Studies
Three-phase Steam and Condensate Project Results in Savings of Up to $1,500,000 Per Year and ROI in Less Than 12 Months
Anshan Iron & Steel, China
Download PDFDetailed Study, Design and Turnkey Installation of New Heat Recovery System Results in Annual Savings of $196,000 for Global Chemical Manufacturer
Huntsman, Switzerland
Download PDFComposite Audit of Utility Services Leads to Best-in-class Utility Maintenance and Substantial Energy Savings at Major Plastics Facility
GE plastics, Alabama, U.S.
Download PDFDevelopment, Engineering, Installation and Financing of Multiple Energy Conservation Projects for Pharmaceutical Company's Acetaminophen Facility
Cavidien, North Carolina, U.S.
Read MoreSteam Trap Management Program Delivers Significant Cost Savings and Reduced Carbon Emissions for Prominent University
Notre Dame, Indiana, U.S.
Download PDFThree-phase Optimization of Steam and Condensate Recovery System for Iron and Steel Plant in China
Panzhihua Iron & Steel,
Download PDFSafety and Risk Reduction Case Studies
Improving Steam System Safety and Reliability for the World's Largest Refinery Plant of Its Kind
Shell’s Pearl GTL, Qatar
Download PDFThree-week Study Leads to Complete Turnkey Installation to Eliminate Water Hammer for a Major Pharmaceutical Company in Europe
GlaxoSmithKline, Belgium
Download PDFArmstrong Designs, Engineers and Installs Condensate Return Solution to Correct Persistent Water Hammer for Major Chemical Company
Dow Chemical, Texas, U.S.
Download PDFHigh-Capacity Insect Heat Treatment for the World's Largest Finished Food Plant
Kraft, Illinois, U.S.
Download PDFExtensive Audit and Custom Solutions Eliminate Severe Water Hammer in the Paris District Heating Loop
CPCU, Paris, France
Download PDFEngineering, Audits and Turnkey Project Services Case Studies
Steam and Condensate System Optimization Includes Engineering Design, Material Purchasing, Installation and More
Liaoyang Petrochemical Company Polyester No. 1, Nylon Plant, China
Download PDFSteam System Study to Identify Energy Conservation Measurements (ECM)
United Regional Healthcare System, Texas, U.S.
Read More | Download PDFEfficient Process Water for Bottle Warming Provided Through Design, Engineering and Turnkey Installation of Water Heating Systems on 13 Production Lines at Eight Facilities
Pepsi Beverage Company Americas, New York, U.S.
Read MoreTurnkey Retrofit Installation of Wireless Steam Trap Monitoring Addresses Lack of Personnel for VA Healthcare System
The Amarillo VA Health Care System, Texas, U.S.
Read MoreTurnkey Retrofit Installation of Wireless Steam Trap Monitoring on Health System's High and Medium Pressure Traps
VA Palo Alto Health Care System, California, U.S.
Download PDFTurnkey Design, Engineering and Construction Services for Hospital's Flash Steam and Condensate Recovery Project
Lehigh Valley Hospital, Pennsylvania, U.S.
Read More | Download PDFO&M Case Studies
Operations and Maintenance of Utilities and Hot Water Generation for Seven-Star Resort
ITC Grand Chola Starwood, India
Download PDFThermal Utilities Improvements Through Operations and Maintenance Services
Frenchman’s Reef & Morning Star Marriott Beach Resort, St. Thomas, U.S. Virgin Islands
Read MoreOn-Site Staff of 38 Provides Ongoing Utility System O&M for Second Largest Tobacco Company in the U.S
R.J. Reynolds Tobacco Company, North Carolina, U.S.
Download PDFFull-time, On-site Staff Provides 24/7 Operations and Maintenance Services in Multi-year Agreement
Kraft Heinz, Iowa, U.S.
Download PDFOperation and maintenance responsibilities include steam, compressed air and waste water treatment systems for this rice manufacturing and packaging facility
Riviana Foods, Tennessee, U.S.
Read More | Download PDFOperations and maintenance to drive energy savings and safety for food company
Beech-Nut, New York, U.S.
Download PDFOperation and Maintenance of Steam and Condensate Distribution Systems, Boilers and All Associated Equipment for Potash Mining Facility
Intrepid Potash, New Mexico, U.S.
Read MoreDesign, Construction and O&M of New Boilerhouse to provide University's Steam and Chilled Water
Western Michigan University, Michigan, U.S
Read More Read Case Histories About Armstrong Trap Management ServicesSkill Development and Training Case Studies
Comprehensive Training for More Than 1,000 Employees of Large Steel Manufacturer
ArcelorMittal Steel North America, West Virginia – Ohio, U.S
Download PDFUniversity's Facilities and Maintenance Staff Utilizes Armstrong's Online Training Curriculum
University of Texas at Austin, Texas, U.S.
Read MoreArmstrong University Online Courses Supplement College Lectures for Piping Apprenticeship Training
Camosun College, British Columbia, Canada
Download PDF